Resume of Ho Young Choi

 

Professional Affiliation : Korean Professional Engineers Association, Member - Mech.

Engsoft Power Lab : 2018.1 ~

 

Managing Director of Engsoft Power Lab

DAEWOO E&C : 2014.3 ~ 2017.12

 

As Senior Vice President for Managing Power Plant Engineering of the following Projects :

- Ras Djinet Combined Cycle Power Plant(Siemens 4000F Single Shaft x 3 Units), Algeria / EPC Turn-key Contract

- SAFI Ultra Supercritical Thermal Power Plant (693MW x 3 Units), Morocco / EPC Turn-key Contract

- Pochon Combined Heat and Power Plant (MHI 501J 2-2-1 x 1 Unit), Korea / EPC Turn-key Contract

- Preparation of bids for overseas and domestic EPC projects

Engsoft Lab : 2013.4 ~ 2014.2

 

As Representative of Engsoft Lab for developing the following software :

- ES_Rankine, Heat Balance Software for Thermal Power Plant

DAELIM Industrial Co., Ltd. : 2010 ~ 2013.3

 

As Senior Vice President for Managing Power Plant Engineering and Execution of the following Projects :

- Shoaiba II Combined Cycle Power Plant (Siemens SGT6-2000E x 10 Units), Saudi Arabia / EPC Turn-key Contract

- Pocheon Combined Cycle Power Plant (MHI 501GAC x 4 Units), Korea / EPC Turn-key Contract

- Gyangkyo Combined Heat and Power Plant (Siemens SGT6-3000E x 1 Unit), Korea / EPC Turn-key Contract

- Preparation of bids for overseas and domestic EPC projects

DAELIM Industrial Co., Ltd. : 1999 ~ 2009

  

As Team Managers for Managing Power Plant Engineering Team and Execution of the following projects :

- Hyundai Green Power BFG Fired Thermal Power Plant (100MW x 4 Units), Korea / EPC Turn-key Contract

- Songdo Combined Heat and Power Plant (GE6FA x 2 Units), Korea / EPC Turn-key Contract

- K-Power Kwang Yang Combined Cycle Power Plant (GE7FA x 4 Units), Korea EPC Turn-key Contract

- BASF-YPC Combined Cycle Power Plant (GE6B x 3 Units), China / EPC Turn-key Contract

- Pusan Combined Cycle Power Plant (GE7FA x 8 Blocks), Korea / Engineering and Procurement of Power Block BOP

DAELIM Industrial Co., Ltd. : 1992 ~ 1999

  

As Lead Mechanical Engineer for Execution of the following projects :

- NTPC Kayamkulam Combined Cycle Power Plant, 350 MW(GE STAG 20), India / Consortium with BHEL, India

- Sibolga Coal-Fired Power Plant ,100MW x 2 Units, Indonesia / EPC Turnkey Project

- Numaligarh Gas Turbine(GE 6B) Co-Generation Power Plant, India / EPC Turnkey Project

- TNB, Paka Combined-Cycle Conversion Project (ABB 13N), Malaysia Consortium with Ansaldo, Italy

HYUNDAI Engineering Co., Ltd. : 1988 ~ 1992

  

As Lead Mechanical Engineer for Execution of the following projects :

- KEPCO, Bundang Combined-Cycle Power Plant, Korea (ABB 11N) / Consortium with ABB

- HYUNDAI Petrochemical Co., Oil-fired Co Generation plant(38 MW), Korea / EPC Turnkey Project

- Lucky Ltd., CFBC Coal-fired Co Generation Plant, Korea / EPC Turnkey Project

JUNGWOO Engineering Co., Ltd. : 1986 ~ 1988

  

As Mechanical Engineer for Execution of the following project :

- KUMI Industrial Complex Coal-fired Combined Heat and Power Plant(80 MW), Korea / Feasibility Study

KOREA Heavy Industries Co, Ltd.(Now DOOSAN Heavy Industries Co., Ltd.) : 1982 ~ 1986

  

As Mechanical Engineer for Proposal of the following project :

- - Panwol Industrial Complex Coal-fired Heat and Power Station(60MW), Korea / Proposal for EPC Turnkey Project

- Assir Oil-fired Power & Desalination Power Plant(60MW), Saudi Arabia / Proposal for EPC Turnkey Project

 

Consultant for Governmental Office : 2001 ~ 2003

  

- Consultant for Korea Research Institute for Human Settlements (KRIHS)

- Consultant for SUDOKWON Landfill Site Management Corp. (Landfill Gas Fired Co-generation Power Plant)